Certified Television Operator Exam Prep
Free practice questions

Free CTO Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

The CTO exam has 50 questions and runs 1 hours.

These 10 free CTO questions are organized by exam domain, so you can see how each part of the Certified Television Operator blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Emergency Alert System

Question 1

During live local flood coverage, a full-power television station receives a validated, applicable National Emergency Message (EAN). Its primary stream is carrying the flood report; two multicast streams are carrying other programs. The EAS insertion equipment is functioning. Which transmission takes priority?

Show answer & explanation

Correct answer: A - Immediate EAN audio and visual presentation across the primary and both multicast streams.

Domain 4: FCC power levels

Question 2

A television transmitter authorized for 40 kW output reads 42.4 kW on its calibrated power meter. No special operating authority applies. How does this reading compare with the FCC's normal television transmitter-power requirements?

Show answer & explanation

Correct answer: D - 106% is within tolerance; operate as near 40 kW as practicable.

Domain 5: program sources

Question 3

A station switches its on-air picture and sound from network receiver A to a verified backup, B, carrying the same network program. Buffering delays B's video, audio, and embedded local-break cues together. The local-insertion controller still starts breaks from A's earlier cues, with no timing compensation. At the next break, what will this mismatch do?

Show answer & explanation

Correct answer: B - Start local insertion before the break in the network program actually on air.

Domain 6: ingesting

Question 4

Ingest review finds conflicting identifiers on a commercial. The traffic schedule, delivered filename, and delivery manifest all specify AD-412-R2. The transfer checksum matches the supplier's checksum, and technical quality checks pass. However, the identification slate inside the file reads AD-412-R1, and the operator cannot establish which version follows that slate. How should the asset be handled?

Show answer & explanation

Correct answer: D - Hold it for version verification and resolution of the conflicting identifiers.

Domain 7: Children's Television time restrictions

Question 5

A Saturday half-hour produced and broadcast primarily for ages 6-10 is surrounded by general-audience programs on a commercial television station. It contains 4 minutes 30 seconds of paid ads, a 30-second promotion for an age-appropriate children's show on the same channel, and a 30-second promotion for an adult drama. There are no product tie-ins or website addresses. Would adding a 45-second paid spot in an unfilled break comply with the children's commercial limits?

Show answer & explanation

Correct answer: B - No; counted commercial matter would total 5:45, an excess of 30 seconds.

Domain 8: how TV facilities work

Question 6

Three program services share one ATSC 1.0 RF transmission. Service 1 is black on two independently fed off-air receivers, while services 2 and 3 look normal on both. Service 1's master-control output, monitored before its encoder, still shows the correct program. These observations are simultaneous, and both receivers are tuned correctly. Where should troubleshooting begin?

Show answer & explanation

Correct answer: C - Service 1's video encoding and its assignment within the multiplex.

Domain 9: operating the station

Question 7

Two 30-second commercials each have a maximum true peak of −3 dBTP. Their full-duration integrated loudness readings are −24 LKFS and −19 LKFS. The station targets −24 LKFS and requires true peaks below −2 dBTP. The operator can apply uniform file gain, with no subsequent dynamic processing, and must recheck the result. Which treatment is appropriate for the −19 LKFS commercial?

Show answer & explanation

Correct answer: B - Apply 5 dB of attenuation; remeasure the full spot's loudness and true peak.

Domain 10: the duties of master control operators

Question 8

One of the on-air router's two redundant power supplies has failed. Either supply can carry the full load; the surviving supply is healthy, and program and off-air monitoring remain normal. No overheating or other hazard is indicated. Station procedure permits operation on one supply during replacement, and engineering performs the hardware work. What is the operator's responsibility while service remains normal?

Show answer & explanation

Correct answer: A - Maintain service, notify engineering, and record the loss of power redundancy.

Domain 12: the digital signal path

Question 9

During an SD signal-path check, the same test patch reads Y′ = 100 at an 8-bit input and Y′ = 400 at a 10-bit output. Both readings are decimal integer codes in BT.601 studio range. No image-level adjustment was requested. What do these readings establish?

Show answer & explanation

Correct answer: D - Both readings describe the same luma level, expressed on different numerical scales.

Domain 15: PSIP

Question 10

An ATSC transport check confirms that MPEG program 3 carries WEATHER and program 4 carries SPORTS. Both programs and their PAT/PMT information are correct. The VCT entry for virtual channel 12.2 is named WEATHER but points to program 4 and its streams. Channel 12.2 should show WEATHER, while both MPEG programs must remain intact. Which correction addresses this mismatch?

Show answer & explanation

Correct answer: C - Correct channel 12.2's VCT entry to identify program 3 and its streams.

The rest of the CTO blueprint

The CTO exam also covers these domains. Drill them in the full free practice test:

That's 10 of 1,030

The full bank has 1,020 more CTO questions with explanations.

Continue in the free practice test →

View plans